Essity – MBBR Biological Treatment Plant Upgrade
Delivering a Turnkey Wastewater Treatment Upgrade Within a 24/7 Operational Paper Mill
Project Information
Client: Essity UK Ltd
Location: Cheshire
Project Value: Confidential
Duration: 6 Months
Services Provided: Turnkey Supply & Installation of Process M&E Equipment
FLI CAP Technology successfully delivered a new biological treatment process for Essity UK Ltd at its Oakenholt paper mill.
The mill produces toilet tissue, facial tissue and paper towels for the UK market and operates an on-site effluent treatment plant to treat trade effluent before discharge into the River Dee estuary in accordance with NRW consent conditions. Essity.docx
With the existing biological treatment plant requiring significant renovation, FLI CAP Technology was appointed to deliver a new Moving Bed Biofilm Reactor (MBBR) treatment process.
Project Scope
FLI CAP Technology undertook the project on a turnkey basis, including the:
- Design of the new biological treatment process
- Equipment supply
- Installation
A key consideration was the continuous operation of the mill. With production running 24/7 and few opportunities for shutdown, the new installation was carried out in parallel with the existing process and carefully managed to maintain effluent discharge quality throughout the project.
MBBR Treatment Process
An MBBR system was selected for the biological degradation of soluble organic impurities within the effluent.
The process uses mobile media contained within an aeration tank, providing a surface on which biomass can grow. The selected media provides a protected surface area of 800m²/m³, allowing soluble organic pollutants within the wastewater to be biologically degraded.
Surplus biomass leaving the MBBR vessel is subsequently separated from the final effluent using a DAF clarifier. Essity.docx
Treatment Capacity & Performance
The biological treatment plant was designed to process:
2,000m³/day of effluent
1,500kg COD/day biological load
The guaranteed treated effluent quality was:
- BOD: 50mg/l
- TSS: 30mg/l
- NH₄+: 16mg/l Essity.docx
Successful Delivery Within a Live Manufacturing Environment
Close planning between FLI CAP Technology and the Essity project team ensured that installation of the new MBBR process did not impact factory operations.
The completed plant successfully achieved the agreed performance targets, providing Essity with an upgraded biological treatment process capable of supporting the ongoing requirements of its Oakenholt facility.